Inspecting the internal lime plastering which has been completed. The colour of the lime next to the oak structure looks so beautiful that we’re leaving it unpainted.
May 2021
Inspecting the internal lime plastering which has been completed. The colour of the lime next to the oak structure looks so beautiful that we’re leaving it unpainted.
May 2021